国产精品久久久久久亚洲毛片,国产女生裸聊自慰网站,一区二区干夜夜,3D污动漫

PRODUCTS CENTER
Products Are Used In Petroleum, Chemical, Marine, Electric Power, Thermal, Natural Gas, Urban, Steel And Other Fields

Ecc Reducer

所屬分類
inquiry
1
Product description

Pipe Reducers are the component in a pipeline that reduces the pipe size from a larger to a smaller bore (inner diameter).

We produce pipe creducer include oncentric reducers, eccentric Reducers, seamless or welded, with dimensions and tolerances according to Asme/Ansi B16.9 and EN 10253-4

A reducer is the component in a pipeline that reduces the pipe size from a larger to a smaller bore (inner diameter)

What is the difference between concentric and eccentric reducers ?

Concentric reducer is symmetrical both ends are aligned along the center.

Eccentric reducer is not symmetrical ends are off center of one another.


 

 

Main Processing Technology

Raw Materials Into The Factory → Billet Cutting → Reel Pipe (Only In Seamed Pipe Fittings) → Welding (Only In Seamed Pipe Fittings) → Heating → Moul Ding → Heat Treatment → Machined Groove → Surface Treatment → Finished Product Inspection → Marking Protection → Put In Stock

(Note: there is a pickling passivation process after stainless steel products groove processing)

Size

1/2"-120" 

Standard

 

ASTM A234

WPB, WPC, WP11, WP12, WP5, WP91, WP22

ASTM A403

WP304, WP304L, WP316, WP316L, WP321

ASTM A420

WPL3, WPL6

API 5L

L245(NB), L290(X42), L320(X46), L360(X52), L390(X56), L415(X60), L450(X65), L485(X70), L555(X80)

EN 10253-2

P235GH, P265TR2, P265GH, P355NH

L245(NB), L290(X42), L320(X46), L360(X52)

L390(X56), L415(X60), L450(X65), L485(X70), L555(X80)

ASTM A105

A105, A105N

ASTM A350

LF1, LF2, LF3

ASTM A694

F42, F45, F50, F52, F56, F60, F65, F70

ASTM A182

F5, F9, F11, F22, F91, F304, F304L, F316, F316L, F316H, F321

 

Wall  Thickness

SCH5, SCH10, SCH20, SCH30, SCHSTD, SCH40, SCH60 SCHXS, SCH80, SCH100, SCH120, SCH140, SCH160, SCHXXS

Color

Black, Yellow, Blue, Red. etc as client requirment.

Surface  Coating

Rust-proof oil; Black; Galvanized; Polyethylene Coating; Epoxy Coating, etc

Marking

Marker permanent

Package

Ply-Wooden Case for small size  Pallet for big size

Certificate

BV ISO9000,CRN,CE

The Third Party Inspection

BV,SGS,LOIYD,TUV,and other party alloyed by clients

Brand

TSZHONGRAN

Min Order

1PCS

Payment Terms

T/T, 100% LC AT SIGHT, 100% LC 30 OR 60DAYS AFTER BL OF DATE,

Delivery Time

7-30days according to acutal order.

Delivery Port

TIANJIN, QINGDAO,SHANGHAI, NINGBO, SHENZHEN,

Delivery Ability

3000TONS/MONTH

Applicating

Paper-marking, Oil and natural gas pipeline, Boiler and heat exchanger, Smelting,Water conservancy, Electric power, Chemical, Pharmaceuticals etc

Main Equipment and Installation

1:2500T press (mainly used for die forming)

2:500T Press (Mainly Used for Molding)

3:315T Press (Mainly Used for Molding)

4:150T Press (Mainly Used for Molding)

5: 2 coal-fired heating furnaces

6: 1 oil-fired heating furnace

7: 1 pipe blanking machine

8: Machining equipment: lathe C630, two lathes CW6163C, one lathe CR61100A, one milling machine a6232A

9: Heat treatment: 1 car-type oil-fired heat treatment furnace, effective heating area of 8 M2 car-type box resistance furnace RT9-80*1500*60, the highest furnace temperature 1200℃

10: Sandblasting equipment 2 sets

11:One set of air compressor and one set of liquid cooling pool

12: 2.4m reeling machine

13:14 Argon Arc Welding and Handheld Welding Machines

14: 2 welding rod drying equipment

15:260 sets of mould tools for different diameter pipe

16: One stainless steel pickling tank

17: A manual grinder (for large-caliber groove treatment)

18: Two plasma cutting machines

 

一.Acceptance and Acceptance of Raw Materials

1. Raw materials shall meet the requirements of relevant standards and technical specifications.

2. There should be no oil pollution on the surface of raw materials. Excessive rust corrosion and obvious dent defects, low melting point metal pollution, etc.

3. Check the quality certificate, furnace number, batch number and specifications of raw materials, manufacturers and implementation standards.

4. Mechanical rust removal of raw materials with wire brushes to meet the requirements of non-destructive testing.

5. Dimension testing of raw materials (length, diameter, thickness and unevenness of steel tubes).

6. After entering the factory, the steel pipe should be re-inspected by ultrasonic wave. Grade I is qualified.

7. Physical and chemical testing, chemical element analysis, mechanical properties and hardness testing of steel pipe or steel plate according to furnace batch number and specification. The test results should meet the requirements of relevant standards.

8. Number registration in accordance with factory regulations after reexamination

二. Manufacturing process

1. Material selection and blanking, according to the design requirements of different diameter pipe, select appropriate steel plate (rolled and welded into cylinder) or steel pipe, and use cutting blanking to clean up iron oxide and gas cutting spatter residues on pipe material. The furnace, batch number and pipe fittings specifications, engineering name and number of raw materials are clearly identified.

2. Compression Forming of Variable Diameter Pipe

(1) Operators should learn relevant process documents and be familiar with the operation methods and process of equipment, and be prepared for all kinds of appliances needed in the process of work.

(2) Furnace charging heating: The reducer blank is loaded into the natural gas heat treatment furnace, and the bottom is separated from the furnace by the horn to ensure the distance between the different diameter pipes is ≥200mm, and the heating rate above 400°C is ≤200°C/h.

(3) Heating the blank of different diameter pipe, heating and holding (to ensure that the blank is burnt through), then pressing the blank after discharging from the furnace, putting the blank into the mould and pressing it with a press.

3. Shaping: Heating the diameter pipe again, and processing the diameter with press and brace until it meets the requirements.

4. End removal: Take the center of the diameter pipe as the reference to measure a certain distance from the two ends, and remove the surplus parts with gas cutting or plasma cutting gun.

5. Heat treatment: According to the heat treatment process, the tube with different diameters is put into the furnace for heat treatment.

6. Surface treatment: After heat treatment, the surface oxide scales of the pipe fittings are removed by sandblasting machine.

7. Mechanical properties testing: According to relevant standards, the mechanical properties of different-diameter tubes are tested to ensure that the mechanical properties of different-diameter tubes meet the standards. The testing items and sampling directions should meet the requirements of relevant standards or technical specifications.

8. Groove processing: mechanical end processing groove according to design confirmation drawings.

9. Appearance detection

(1) There should be no cracks, over-burning, over-heating and other phenomena, and no hard spots on the surface of the pipe.

(2) No obvious folds are allowed in the transition zone.

(3) Welding repair is not allowed for any defect on the body of the pipe with different diameters.

10. Dimension Detection

The company's relevant inspectors, according to the drawings and pipe fittings related standard requirements for dimensional testing, and meet their tolerance requirements.

11. Surface treatment (grinding): The inner and outer surface of the pipe should be smooth, without any damage to strength and appearance defects, such as scars, scratches, heavy skins, etc. When defects are found, they should be grinded. The thinning of the grinding area should be no less than 93.5% of the original wall thickness. The grinding area should be smooth and be cleared by staining agent or magnetic powder inspection.

12. Non-destructive Testing of Hot Pressed Variable Diameter Pipe

After heat treatment, the qualified certificate holder of the company carries out radiographic inspection of the weld seam according to the requirements of the standard. The results should meet the requirements of NB/T47013.2-2015 II level. The magnetic powder or penetration test should be carried out on the body of the pipe. The test results should meet the requirements of NB/T47013.4-2015 or NB/T47013.5-2015 I level.

13. Acid pickling and passivation treatment

Pickling and passivation of stainless steel pipe parts

14. Identification

Mark with a spray-brush or low-stress impression, and clearly mark the contents required by the standard on the outer wall in sequence.

15. Storage and transportation of different diameter pipes

In the course of transportation, the diameter pipe can not contact any part of the carriage to avoid bumping.

 

Related products
· Pipe Fitting

中燃管道

Hebei Zhongran Pipefitting Co., Ltd.

Copyright:Hebei Zhongran Pipefitting Co., Ltd.       

一级毛片视频国产| 国产二区三区| 青青草.99| 久久亚洲AV无码国产精品麻豆| 亚洲一区中文字幕成人| 欧美大鸡吧草比老湿机| 久久久久99精品成人片试看| 国产精品久久众合亚洲| 午夜精品久久久蜜桃| 婷婷综合久久AV一区二区三区| avova 丝袜偷拍| 国产精品人妇原创在线播放| 熟妇中国字幕| 天天狠天天透天干天干| 波多野结衣中文字幕青青草一区| 性无码专区性| 五月婷婷之色宗激情五月| 中文字幕在线无码加勒比| 亚洲人成网站在线在线观看| 亚洲三区视频| 久久香蕉操操操| 夫妻久久网| 国产情景AV| 色综合久久婷婷| 亚洲天堂免费| 国产偷自视频区视频一区二区| 国产草青青| 亚洲综合精品推荐在线观看| 久久久99美女B毛| 伊人春色婷婷五月| 欧美日韩国产综合aⅴ| 91电影一区| 欧美综合日韩 久久久| 九九热久久免费| 国模冰莲自慰肥美胞极品人体图| www.久久久com| 中文字幕乱码日本亚洲一区二区| 69精品人人槡人妻人人玩蜜桃| 国产精品爆乳精品九九| 日韩精品熟妇| 国产伦精品一区二区三区新乡影视|